Saturday, May 03, 2008
Pennine Journey – Up, Through and Down!
Sunday, April 27, 2008
Pennine Foothills – Western Side
After their first night afloat, we soon came to Scout Tunnel, and David fancied sitting on the front as we went through – certainly a unique experience!
They made up for it by walking up the remaining mile and a half (and nine locks) to see the tunnel mouth, with its gates in the striking design of a boat being 'legged' through the tunnel. Then back down all those 17 locks (but only 6 miles) to Stalybridge, but not without some excitement. The boat went aground very badly in a short 'pound' (section of canal between two locks) and we had to let some more water down to float it off the mud. What we hadn't realised was that the people on the boat in front of us were still filling the lock as we came down the lock above. Then we needed to refill the same lock after they had gone down, and the pound was so short that the level dropped dramatically.
except that this time it was Julie's turn to ride on the front of the boat through Scout Tunnel, and she got this great picture of the rock formations in it.
And, just to finish this episode, here she is as the 'figurehead' on the front of Zindagi. We certainly enjoyed having David & Julie with us, and we get the feeling that they may be back for more – great!Tuesday, April 08, 2008
Snow on the Peaks – and Down Again
At Marple Junction, we turned right and started heading south again, as the canal skirted round Marple Ridge towards Whaley Bridge and Bugsworth. Although we had been at the same level (about 500 feet above sea level) since Bosley locks, 16 miles south of here, it was as if we had suddenly climbed higher – we found ourselves looking down valleys and across them to higher hills. We were on the Peak Forest Canal, just on the edges of the Peak District. We came here in 1978, on our second canal holiday, and tackled the whole route from Great Haywood to Whaley Bridge and back in just one week. Ambitious, but we made it – just!
No such punishing schedule for us this time! We left Great Haywood way back at the end of February, though admittedly we have taken many diversions since then. We have not had to battle against the slow speed enforced by the shallowness of the Macclesfield and Peak Forest Canals, but just relax and enjoy it!
We had read in our old edition of Nicholson's Guide that Bugsworth (aka Buxworth) Basin was closed, but a quick check told us that it was now open again. Worth a look, we thought. It certainly is a massive project which has been undertaken by a faithful group of volunteers over 30 years. We have some pictures here, but for more (fascinating) information have a look at their website.
Apparently it was one of the largest inland ports on the whole canal system, handling vast amounts of stone and lime, which were then transported by canal all over the country.
The weather forecast over the weekend was for snow in northern England, so it was no real surprise to find a white landscape as we woke on Sunday. It certainly emphasised the fact that we were surrounded by higher hills!
We stayed put and enjoyed lunch at the Navigation Inn. Some beautiful canal scenes, crying out to be photographed! More snow fell later in the day, when most of the first layer had melted, so the next morning still presented us with snow-capped hills, before we set out to return to Marple Junction and start down the
214 feet drop in level through 16 locks in just one mile. We normally reckon to cover about 3¾ locks or miles per hour, so potentially this step down could have taken us nearly 4 hours. In the event, it only took us just over 2, as the locks are close enough together that Dave could walk ahead and start the next lock filling while the lock was still emptying where Val was on board Zindagi. A very pleasant flight of locks, in mixed surroundings, with town and country and busy road and rail bridges.
We also had some help on the last few, from a friendly cyclist who filled the locks ahead of us, using a large spanner instead of a windlass!
After coming down this flight, we started looking for somewhere to moor for the night, but had to travel on a bit first, crossing the Marple Aqueduct, itself nearly 100 feet above the river Goyt, next to a railway viaduct a little higher. We eventually moored only a few hundred yards from a housing estate, yet in what seemed like a remote piece of countryside.
Dave's morning walk revealed that we were also very close to a local nature reserve, with plenty more rural gaps before we came right into Manchester suburbs. Butterbur plants here are coming into flower, too.
A short run for 1½ hours this afternoon (with two more turnover bridges!) brought us here to Dukinfield Junction, where the Peak Forest Canal joins the Ashton Canal going down into Manchester itself and the Huddersfield Narrow Canal going up into the Pennines. Despite the fact that we are right into the Manchester conurbation, it seems quiet enough, apart from the persistent honking of the Canada geese! We need to stay here for a couple of days to get some 'chores' done, then on up towards Huddersfield, meeting Dave & Julie in Stalybridge on Saturday.
Monday, April 07, 2008
Back on the Macc! – Aqueducts and Embankments
One of the characteristics of this canal is that it seems to follow the contours like some of the earliest canals and then suddenly 'leap' across a valley on a massive embankment and/or an aqueduct over a road, railway or river. Right there at Congleton Wharf, the canal crosses a busy road on a fine aqueduct and then, about a mile later, crosses a river valley on an enormous embankment, echoed by the railway viaduct (just a few feet higher) a little further down the valley.
One result of this way of building the canal (nearly 200 years ago) is that all the locks are concentrated into one flight of 12, raising the level by 118 feet just as the Pennine foothills draw closer. Here is Zindagi just a few hundred yards from the foot of the locks and you can just see the railings of another aqueduct (over the River Dane) on the left. Here it is from river level!
That climb took us up to about 500 feet above sea level, and the canal stays at this level for the rest of its length, all the time getting closer to the hills, and still with those 'trade mark' turnover bridges (here's another one!)
and an increasing number of enormous red-brick mills, mostly converted into use for light industry. This former textile mill is just outside Bollington, and it is interesting to see how very industrial this whole area once was, largely based on the canal.
Just near Macclesfield, we saw a dramatic reminder of the engineering involved in building and maintaining canals.
This vast landslip didn't block the canal, but it easily could have done, and the tow path was obviously out of action!
And so, on to Marple Junction, where we joined the Peak Forest Canal just after Marple Wharf, complete with old buildings, seen framed here by yet another turnover bridge.
Saturday, March 29, 2008
Caldon Contrasts
Why? The Caldon Canal, of course! We had intended to go there some weeks earlier, but the lock work was only due to finish on 14th March, so we even had to wait a couple more days on the outskirts of Stoke before heading up on the 15th.
Polythene Pollution. All the canal guide books wax lyrical about the beauty of the Caldon Canal, but they seem to forget to tell you that you have to work your way out of Stoke first, before you come to the attractive bits! There are the old 'bottle' kilns from the remains of the pottery industry, but they mostly stand alone in sites that have been demolished for new housing developments. Should be nice when they are done, and some improvements are being made to the 'canalscape' alongside, too – very welcome! But we still had to contend with slow progress along the canal itself, for two reasons: firstly, the water level seemed very low, so the canal was shallow and that slowed us down. Secondly, there seemed to be even more than the usual amount of urban rubbish in the canal, including the dreaded polythene bags that attach themselves to the propellor. Pretty much the boater's equivalent of a flat tyre – you need to stop, open the weed hatch over the prop and get the obstruction out, whether it be weed, wire, rope or plastic. We had them all!
Here is some fine metalwork on the little footbridge taking the towpath over to the Leek arm of the Caldon, while the 'main line' of the canal falls away down three locks to join the Churnet valley. The
Leek arm then crosses the main line on an aqueduct and takes a pretty contour-hugging route around the side of the same valley and through a short tunnel before coming to an unceremonious stop where the canal and aqueduct have been filled in. The long walk in to Leek is past a large concrete works and industrial estate – a Leek Letdown!
Remote and Roadless. The next day, we retraced our route back to the junction and went down the locks to follow the main line. Just after Cheddleton, as the road left the valley, we were joined by the Churnet Valley Railway and so rail, river and canal shared the remote wooded valley down to Consall Forge, where the Black Lion pub
was once totally inaccessible by road, and the platform and Waiting Room of Consall Station hang cantilevered over a very narrow section of the canal.
As we went on down this lovely wooded valley, we realised that we were still a little early to see the Caldon at its best. Spring was only just beginning; the bluebells and wild garlic would not be out for a few weeks, and the trees were only just starting to show a hint of green. Lovely, nonetheless!
We took Adam and Rachel down the valley beyond Consall before they left us to walk back to the Boat Inn and resume their weekend in the Peak District. We went down to Froghall again to turn around, moored up opposite the
Black Lion at Consall and popped in for an evening meal in probably the remotest pub we are likely to visit!
Snow Surprise. We awoke next morning to an unexpected outlook! It didn't last very long, but made spring look like winter again as we headed back up through Cheddleton. By the time we reached the locks at Hazelhurst, there was no trace of it, and we moved on towards Stockton Brook. Adam and Rachel picked up Jeremy on Monday to get him to a train as they travelled home.
They all had to be back at work the next day, and Jeremy had to get ready for a trip to Chad by the end of the week. We just had to get back to Stoke to sort out two things: a couple of parcels to collect, and trying to get our old alternator repaired. One parcel was there, but we had to wait a couple of days for the other one. We ran into setbacks with trying to get the alternator repaired and so have still got to sort that one out. Meanwhile, moored near a lake on the edge of Stoke, there are signs that spring really IS on its way!
Subscribe to:
Posts (Atom)
